Thread Rating:
  • 1 Vote(s) - 5 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Release Candidate Firmware V1.20 RC5
(10-09-2019, 04:38 PM)MatzeMillion Wrote:
(10-02-2019, 11:00 AM)XORadmin Wrote: About the CV input and recording. I was experimenting and searching for the problems i had while recording. Test keyboard was the Arturia Keystep, which i thought would be perfect to test. But the results were very bad, while the trigger was right, the notes often arrived one step too late.

I now found out that this is a problem with the keystep, it has quite a slew between notes. I researched for it and directly got to the information that it is not only my unit:

https://www.muffwiggler.com/forum/viewto...82#2283582

That means the Keystep is causing the problems that i have. What i will do is to add a adjustable delay for CV recording, so also here the correct notes are filled in on the correct steps. However, i am not sure how tricky this is going to be, as the sequencer can already be on another step when the voltage is stable....they are probably the same issues with the BSP.
I will do my best to get the release ready soon. Some more surprises are in there...

You probably have tried the worst case with the KeyStep. Once solved, everything else should be perfect. I tried CV recording with an SH-09 and the results were better than what you described. I only had double triggers sometimes from the worn out key contacts in my SH-09, which tend to send a tiny spike at the release of a key. Would it make sense to have CV recording delay and also a minimum trigger length?

I got the keystep under control now. And i think your issue should be solved as well. I introduced 2 additional new recording possibilities, which samples the note after a trigger or a gate. The sample delay can be set from 0 to 9 milliseconds. If sampling with gate, then it filters out peaks as well which should help in your situation.
PLEASE use the search function if something have been asked or discussed before.
Every (unnessesary) forum support means less time to develop! But of course, i am here to help!  Smile
Reply


Messages In This Thread
RE: Release Candidate Firmware V1.20 RC3 - by Mat - 08-27-2019, 10:47 AM
RE: Release Candidate Firmware V1.20 RC3 - by Mat - 09-03-2019, 10:56 AM
RE: Release Candidate Firmware V1.20 RC3 - by XORadmin - 10-09-2019, 09:02 PM
RE: Firmware V1.20 Release Candidate - by ehr - 07-26-2019, 04:01 PM
RE: Firmware V1.20 Release Candidate - by modbang - 07-26-2019, 07:38 PM
RE: Firmware V1.20 Release Candidate - by skybox - 07-26-2019, 07:50 PM
Lockup loading proj. with 1.20 RC - by StateAzure - 08-05-2019, 04:39 PM

Forum Jump:


Users browsing this thread: 1 Guest(s)